Structural Repairs and Plumbing Alterations
For the Westhoughton project, the first step in the complete bathroom makeover involved addressing significant structural issues. We removed damaged wall areas and water-damaged floor joists to ensure a solid foundation for the renovation. Our team also made necessary alterations to the plumbing works to accommodate the new bathroom layout and fixtures, ensuring everything functioned perfectly.
Electrical Upgrades and Premium Tiling
Next, we performed electrical alterations to enhance the bathroom’s functionality and safety. We then meticulously tiled the areas using the finest quality materials, chosen for their durability and appearance. This attention to detail in the tiling process ensured a beautiful and long-lasting finish that would stand up to daily use.
High-Quality Finishes and Flooring
To complete the bathroom makeover, we installed high-quality bathroom furniture, enhancing both the look and usability of the space. The project was finished with LVT (Luxury Vinyl Tile) floor covering, selected for its resilience and stylish appearance. This combination of premium materials and expert craftsmanship resulted in a luxurious and practical bathroom that met the highest standards.